All rights reserved Calvary Baptist Church Lancaster, Ohio 43130

Building Project

Loan Signing

Start of Project

Getting wood for Trim at Menz

Menz sawmilling wood for trim

Taking care of Windows and electric

Excuvating starts

Bulldozer

New matching window in library

Crew behind church

foundation for retaining wall

drainage in

The retaining wall

Working on retaining wall

Digging ditch

Andy & Kelly in the trenches

Wall done  & Brad Seeding

Ben & Jim with the Rebar

Jefferson and Jay

Jerry Forming

Blocks being dropped up

Brad and Ben installing plumbing

Concrete Truck and footing

Block Wall above foundation

Boarding up Openings

Block Layers

Overview of work site

Building Back wall

Footer for South wall

South Wall started

South wall in progress

I beam set

three walls compete

Fourth wall going up

All Four walls up

Painting outside North wall

The Painting Crew

South Wall painting complete

Ready for the Steel Girders next

Steel Erection

Steel beams going into place

Steel being placed

Steel Girders in place

2nd Floor Pan in Place waiting for concrete

Second Floor Concrete

Concrete in on 2nd floor

gravel on the floor

Digging for plumbing

Plumbing Stubbed

Plumbing complete and under

Vaor Barrier installed before concrete

Concrete finished 1st floor

steps in place